Locomotive Design & Build Services
Clayton Equipment offer a special project Design and Build service; tunnel drilling machines; cable handlers; overhauling or upgrading your existing equipment; converting from old Diesel to clean Battery – Clayton Equipment can provide you the solution.
CONVERSIONS
Converting existing assets can be a cost-effective way of extending the life, for minimal cost and down-time. Old diesel locomotives continue to become less acceptable over time, the solution being a conversion to clean battery technology. Further benefits include reduced fuel and maintenance costs and an improved acceptance in built-up areas.
With Stage V Diesel emission compliance becoming a legal requirement from 1st January 2019, contact Clayton Equipment to help you meet the changes.
“Old Diesel locomotives can no longer be used in tunnel construction”
SPECIAL MACHINES
Tunnel construction doesn’t stop with just the tunnel. Clayton Equipment offers you bespoke solutions to drill and fit out the installation; essential when the tunnel is long and delivery is tight.
GET IN TOUCH
Clayton Equipment Ltd welcomes any questions you may have about our products, company, or web site. If you would like to contact a member of staff at our head office directly, please use the information provided below to assist with your enquiry.
DIRECTIONS
By Road
Exit the A38 and take the A5121 ramp to Burton (0.2 mile)
At the roundabout, take the exit onto Wellington Road / A5121 (0.6 mile)
At the next roundabout, take the 1st exit onto Second Avenue (384 ft)
Turn right. Clayton is located on the right (377 ft)
By Rail & Air
Burton Upon Trent railway station is approximately 5 minutes or 1.6 miles away by taxi. Clayton is also a short journey from both East Midlands (23 miles) and Birmingham (30 miles) international airports.
Contact Us Now
A contact form for any enquiries, feedback and comment has also been provided for your convenience. Required fields are denoted by a * next to their description.