+44 (0)1283 524470 | Customer Support | Contact

Design & Build

DESIGN & BUILD

Clayton Equipment offer a special project Design and Build service; tunnel drilling machines; cable handlers; overhauling or upgrading your existing equipment; converting from old Diesel to clean Battery – Clayton Equipment can provide you the solution.

SPECIAL PROJECTS

Clayton Balfour Beatty tunnel works train

OVERHAUL, UPGRADE & REPAIR

Clayton Llechwedd manrider before overhaul

CONVERSIONS

Clayton battery locomotive London Underground

CONSULTANCY & TRAINING

Clayton battery tunnel locomotive Costain

CONVERSIONS

Converting existing assets can be a cost-effective way of extending the life, for minimal cost and down-time. Old diesel locomotives continue to become less acceptable over time, the solution being a conversion to clean battery technology. Further benefits include reduced fuel and maintenance costs and an improved acceptance in built-up areas.

With Stage V Diesel emission compliance becoming a legal requirement from 1st January 2019, contact Clayton Equipment to help you meet the changes.


“Old Diesel locomotives can no longer be used in tunnel construction”


SPECIAL MACHINES

Tunnel construction doesn’t stop with just the tunnel. Clayton Equipment offers you bespoke solutions to drill and fit out the installation; essential when the tunnel is long and delivery is tight.

CONTACT FORM